• Event Failure

    From Daryl Stout@1:103/705 to digital man on Sun Dec 26 23:53:16 2021
    Rob,

    For some reason, I can not get the nightly maintenance batchfile
    to run...or to have a batchfile run to "busy out the BBS" so the
    maintenance can run separately. Whenever I try to enter "Requires
    Exclusive Execution, it NEVER saves it, always reverting to NO. I
    am wanting to busy out the BBS so the maintenance will run. The
    MSGMAINT utility runs at 5am, but I need to run the doorgame
    maintenance just after midnight local time.

    Daryl
    ---
    þ Synchronet þ The Thunderbolt BBS - Little Rock, Arkansas
    * Origin: Vertrauen - [vert/cvs/bbs].synchro.net (1:103/705)
  • From Digital Man@1:103/705 to Daryl Stout on Tue Dec 28 07:54:46 2021
    Re: Event Failure
    By: Daryl Stout to digital man on Sun Dec 26 2021 11:53 pm

    Rob,

    For some reason, I can not get the nightly maintenance batchfile
    to run...or to have a batchfile run to "busy out the BBS" so the
    maintenance can run separately. Whenever I try to enter "Requires
    Exclusive Execution, it NEVER saves it, always reverting to NO.

    For an event to run exclusively, it must have a specific node number to "run as". What do you have the "Execution Node" set to? If it's set to "any", then it cannot be an exclusive event.

    I
    am wanting to busy out the BBS so the maintenance will run. The
    MSGMAINT utility runs at 5am, but I need to run the doorgame
    maintenance just after midnight local time.

    Not sure what "busy out the BBS" means.
    --
    digital man (rob)

    Synchronet/BBS Terminology Definition #43:
    IHA = Ille Homine Albe (Steve Deppe)
    Norco, CA WX: 44.8øF, 82.0% humidity, 1 mph SSW wind, 0.11 inches rain/24hrs --- SBBSecho 3.14-Linux
    * Origin: Vertrauen - [vert/cvs/bbs].synchro.net (1:103/705)
  • From The Millionaire@1:103/705 to Digital Man on Tue Dec 28 08:16:32 2021
    Re: Event Failure
    By: Digital Man to Daryl Stout on Tue Dec 28 2021 07:54 am

    Re: Event Failure
    By: Daryl Stout to digital man on Sun Dec 26 2021 11:53 pm

    Rob,

    For some reason, I can not get the nightly maintenance batchfile
    to run...or to have a batchfile run to "busy out the BBS" so the maintenance can run separately. Whenever I try to enter "Requires Exclusive Execution, it NEVER saves it, always reverting to NO.

    For an event to run exclusively, it must have a specific node number to "run as". What do you have the "Execution Node" set to? If it's set to "any", then it cannot be an exclusive event.

    I
    am wanting to busy out the BBS so the maintenance will run. The
    MSGMAINT utility runs at 5am, but I need to run the doorgame
    maintenance just after midnight local time.

    Not sure what "busy out the BBS" means.

    he wants the BBS to go offline while maintenance then back online.

    $ The Millionaire $
    --- SBBSecho 3.14-Linux
    * Origin: Vertrauen - [vert/cvs/bbs].synchro.net (1:103/705)
  • From MRO@1:103/705 to Digital Man on Tue Dec 28 10:48:15 2021
    Re: Event Failure
    By: Digital Man to Daryl Stout on Tue Dec 28 2021 07:54 am

    I
    am wanting to busy out the BBS so the maintenance will run. The
    MSGMAINT utility runs at 5am, but I need to run the doorgame
    maintenance just after midnight local time.

    Not sure what "busy out the BBS" means.

    he wants all the nodes down and the bbs non accessable until his maint is done ---
    þ Synchronet þ ::: BBSES.info - free BBS services :::
    * Origin: Vertrauen - [vert/cvs/bbs].synchro.net (1:103/705)
  • From Denn@1:103/705 to MRO on Tue Dec 28 10:48:08 2021
    Re: Event Failure
    By: MRO to Digital Man on Tue Dec 28 2021 10:48 am

    I
    am wanting to busy out the BBS so the maintenance will run. The
    MSGMAINT utility runs at 5am, but I need to run the doorgame
    maintenance just after midnight local time.

    Not sure what "busy out the BBS" means.

    he wants all the nodes down and the bbs non accessable until his maint is done

    I'm not sure why he would need to down all nodes for an event? I set one node aside to run my events, it's not like the old days when we had a lot of people logging onto our BBS's.

    ... La Quinta is Spanish for "Next to Denny's."

    ---
    þ Synchronet þ outwestbbs.com - the Outwest BBS
    * Origin: Vertrauen - [vert/cvs/bbs].synchro.net (1:103/705)
  • From MRO@1:103/705 to Denn on Tue Dec 28 12:41:41 2021
    Re: Event Failure
    By: Denn to MRO on Tue Dec 28 2021 10:48 am

    I'm not sure why he would need to down all nodes for an event? I set one node aside to run my events, it's not like the old days when we had a lot of people logging onto our BBS's.


    he's weird.
    ---
    þ Synchronet þ ::: BBSES.info - free BBS services :::
    * Origin: Vertrauen - [vert/cvs/bbs].synchro.net (1:103/705)
  • From The Millionaire@1:103/705 to Denn on Tue Dec 28 13:19:14 2021

    Re: Event Failure
    By: MRO to Digital Man on Tue Dec 28 2021 10:48 am

    I'm not sure why he would need to down all nodes for an event? I set one node aside to run my events, it's not like the old days when we had a lot of people logging onto our BBS's.

    ... La Quinta is Spanish for "Next to Denny's."

    ---
    â–  Synchronet â–  outwestbbs.com - the Outwest BBS


    I did that too when I ran my bbs before. One node is enough for maintenance.

    $ The Millionaire $
    --- SBBSecho 3.14-Linux
    * Origin: Vertrauen - [vert/cvs/bbs].synchro.net (1:103/705)
  • From Digital Man@1:103/705 to MRO on Wed Dec 29 15:58:01 2021
    Re: Event Failure
    By: MRO to Digital Man on Tue Dec 28 2021 10:48 am

    Re: Event Failure
    By: Digital Man to Daryl Stout on Tue Dec 28 2021 07:54 am

    I
    am wanting to busy out the BBS so the maintenance will run. The MSGMAINT utility runs at 5am, but I need to run the doorgame maintenance just after midnight local time.

    Not sure what "busy out the BBS" means.

    he wants all the nodes down and the bbs non accessable until his maint is done

    I suppose that *could* be what he wants, but I was asking for *his* clarification. Synchronet never has (even back in the dial-up modem days) made a node (or phone line) "busy" while an exclusive event was being executed. Instead, a message explaining that the node is not available is displayed (instead of login prompt) to the user and the session is disconnected.
    --
    digital man (rob)

    Rush quote #38:
    See how it sings like a sad heart, then joyously screams out its pain
    Norco, CA WX: 48.7øF, 89.0% humidity, 0 mph ESE wind, 0.02 inches rain/24hrs --- SBBSecho 3.14-Linux
    * Origin: Vertrauen - [vert/cvs/bbs].synchro.net (1:103/705)